Wednesday, February 23, 2011

Horizon Blvd. / Buford Rd. Project - NOTICE OF PUBLIC HEARING

March 1 (Tuesday)

6 p.m. – Open House

6: 30 p.m. – Public Hearing

Salvador Sanchez Middle School
Library
321 N. Rio Vista Road

   

The purpose of the Public Hearing is to present the anticipated social, economic, and environmental effects of the proposed project.  This project extends from 0.09 mile west of Alameda Ave. (SH 20) to 0.06 mile west of North Loop Rd. (FM 76) in El Paso County.  

The proposed project consists of widening the existing two-lane divided roadway to a four-lane divided roadway with one 11-foot wide inside main lane in each direction, a 15-foot wide outside eastbound lane, a 14-foot 3-inch-wide westbound outside lane, a raised median varying from 6 to 13 feet wide, and 6-foot wide concrete sidewalks. The proposed roadway would also offer 10-foot wide center turn bays within the median at all major intersections along Horizon Blvd. (FM 1281).

No comments:

Post a Comment